"e" 搜索结果,为您找到约 10312 条结果
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A storage method in which pallets, cases, or cartons are stacked upward from the floor to whatever practical height is available without the use of shelves.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
Syn: chase production method.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A variation of the weighted-point plan of supplier evaluation and selection. The cost ratio is obtained by dividing the bid price by the weighted scores determined by the weighted-point plan. This pro cedure determines the true costs by taking into account compensating factors. Suppliers are selected and/or evaluated based on the lowest cost ratio.   成本比率计划—评估和筛选供应商的加权指数计划的变化形式。成本比率通过投标价除以加权指数计划决定的 权数求得。该过程通过考虑补尝因素确定真实成本。根据最低成本率可筛选和/或评估供应商。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
关联指定代码
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
预计费用
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
问答 date type
日期类型
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
问答 field length
字段长度
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
项目总值
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
期中结算余额
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
批量计算
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
问答 mouse pointer
鼠标指针
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
问答 other partner
其它业务伙伴
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
计划表
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
禁止记入资产
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
SAP
问答 report syntax
报表语法
All Rights Reserved Powered BY WeCenter V4.1.0 © 2026 京ICP备16065701号