行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A way to control quality by taking one sample and making an accept or reject decision, and, if the decision cannot be made, taking a second sample and making the accept or reject decision by combining the results of both samples....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 downgrade
The substitution of a product of lower quality, value, or status for another, either in planning or in fact.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A discrete measurement of the reduction in quantities ordered sustainable at 30 days prior to delivery with no inventory or cost penalties.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 downstream
Used as a relative reference within a firm or supply chain to indicate moving in the direction of the end customer.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The tasks subsequent to the task currently being planned or executed.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 downtime
Time when a resource is scheduled for operation but is not producing for reasons such as maintenance, repair, or setup.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 draft
Syn: bills of exchange payment.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 drawback
A refund of customs duties paid on material imported and later exported.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 driver
1) In activity-based cost accounting, an opera?tion that influences the quantity of work required and cost of an activity. Syn: cost driver. 2) In the theory of constraints, an underlying cause that i s responsible for several observed effects....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 drop ship
To take the title of the product but not actually handle, stock, or deliver it (i.e., to have one supplier ship directly to another or to have a supplier ship directly to the buyer's customer).
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The last possible date to apply influence to a future activity.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 DRP
Abbreviation for distribution requirements planning.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 DRP II
Abbreviation for distribution resource planning.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 drum
In the theory of constraints, the constraint is viewed as a drum, and nonconstraints are like soldiers in an army who march in unison to the drumbeat' the resources in a plant should perform in unison with the drumbeat set by the constraint....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 drum schedule
The detailed production schedule for a resource that sets the pace for the entire system. The drum schedule must reconcile the customer requirements with the system's constraint(s).