"e" 搜索结果,为您找到约 12205 条结果
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
An MRP, DRP, or other time-phased system in which all time-phased data is processed, stored, and usually displayed using dated records rather than defined time periods (buckets).
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 budget
A plan that includes an estimate of future costs and revenues related to expected activities. The budget serves as a pattern for and a control over future operations.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The total planned budget for a project.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The volume/mix of throughput on which financial budgets were set and overhead/ burden absorption rates established.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
ln project management this term has been replaced with the term earned value.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
ln project management, this term has been replaced with the term planned value.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 buffer
1) A quantity of materials awaiting further processing. It can refer to raw materials, semifinished stores or hold points, or a work backlog that is purposely maintained behind a work center. 2) In th e theory of constraints, buffers can be time or material and support throughput and/or due date performance. Buffers can be maintained at the constraint, convergent points (with a constraint part), di vergent points, and shipping points....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
ln the theory of constraints, a process in which all expediting in a shop is driven by what is scheduled to be in the buffers (constraint, shipping, and assembly buffers). By expediting this material into the buffers, the system helps avoid idleness at the constraint and missed customer due dates. In addition, the reasons items are missing from the buffer are identified, and the frequency of occur rence is used to prioritize improvement activities....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A group of parts with similar lead time, variability, control, and order management characteristics.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 buffer stock
Syn: safety stock.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 bufferzone
A stratification layer within a stock buffer used in the drum-buffer-rope scheduling. Typically, buffer zones are color-coded with red, yellow, and green categories.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 build cycle
The time period between a major setup and a cleanup. It recognizes cyclical scheduling of similar products with minor changes from one product/model to another.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A qualitative forecasting technique in which individuals who are familiar with specific market segments estimate the demand within these segments. The overall forecast then is obtained by calculating the sum of the forecasts for these segments....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 bulk issue
Parts issued from stores to work-in-process inventory, but not based on a job order. They are issued in quantities estimated to cover requirements of individual work centers and production lines. The issue may be used to cover a period of time or to fill a fixed-size container....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 bulk packing
Placing several small packages in a larger container to prevent damage or theft.
All Rights Reserved Powered BY WeCenter V4.1.0 © 2026 京ICP备16065701号