行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CPIM的缩写
Abbreviation for Certified in Production and Inventory Management.   生产和存货管理认证certified in production and inventory management的缩写。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 Cpk
An index method of the variability of a process. A widely used process capability index. It is expressed as: Cpk=(mnearer specification unit) /3s.where m is the mean and s is the standard deviation.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CPM的缩写
Abbreviation for critical path method.   关键路线法critical path method的缩写。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CPOF的缩写
Abbreviation for capacity planning using overall factors.   全要素产能计划capacity planning using overall factors的缩写。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CPU的缩写
Abbreviation for central processing unit.   中央处理器central processing unit的缩写。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
equipment capable of moving items up and down or side to side.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 crashing
ln project management, adding resources to critical path or near-critical path activities on a project to shorten project duration after analyzing the project to identify the most cost-effective cours e of action.   赶工—项目管理中,在分析项目以确定最有成本效益的作业流程后,通过在项目的关键路线和近关键路线的活动中增加资源以缩短项目工期。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 credit period
The time allowed a customer to pay an invoice in full.   信贷期货,付款期限—允许顾客全额付款的时间。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 crew
size standard-A labor estimate of the number of workers necessary to complete the required output for a given shift.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 crew size
The number of people required to perform an operation. The associated standard time should represent the total time for all crew members to perform the operation, not the net start to finish time for the crew.   班组规模—执行一项作业所需的人员数目。其相关的标准时间应该代表所有员工执行该作业的时间总和,而不是该组人员从开工到完成的净时间。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
Any activity on the critical path of a project;an activity with no slack time (i.e., any delay in the activity will delay project completion). See: critical path, critical path method.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The longest sequence of dependent events through a project network, considering both technical and resource dependencies in completing the project The critical chain is the constraint of a project.   关键链—约束理论中,考虑了完成项目过程中的技术优先权和资源争夺约束的项目网络的最长路线。当没有资源争夺存在时,关键链和关键路线相同。参见:critical path....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
ln the theory of constraints, a network planning technique for the analysis of a project's completion time, used for planning and controlling project activities. The critical chain, which determines p roject duration, is based on technological and resource constraints. Strategic buffering of paths and resources is used to increase project completion success. See: critical chain, critical path metho d.   关键链法—约束理论中,分析项目完成时间的网络计划技术,用来规划和控制项目活动。决定了项目工期的这个关键链建立在技术和资源约束基础上。路径和资源的战略缓冲用来增加项目完成的成功率。参见:critical chain,critical path method....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The attributes of a product that must function properly to avoid the failure of the product. Syn: functional requirements.   关键特性—必须正当发挥功能以避免产品故障的产品特性。同义词:functional requirements.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The malfunction of those parts that are essential for continual operation or the safety of the user.   关键性故障—对持续运作或使用者的安全造成重要影响的部件故障。