行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 critical mass
Individuals who add value to the product or service. These individuals include personnel working directly on the product, personnel providing a service to the customer, and personnel who provide suppo rt for the product or service (e.g, after-sale service).   关键群体—为产品和服务增加价值的个人。这些个人包括直接在产品上的工作人员、向顾客提供服务的人员和为产品或服务提供支持(如售后服务)的人员。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 critical path
The longest sequence of activities through a network. The critical path defines the planned project duration. See: critical activity, critical path method.   关键路线—项目管理中,界定网络工期的一组作业。这些作业几乎没有时差或松弛时间,即时差 通常为零。任一关键路线作业的延期都会造成整个项目的延期。参见:critical activity, critical path method....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
ln project management, any activity on a network's critical path as determined by the critical path method.   关键路线作业—项目管理中,任一关键路线法决定的网络关键路线中的作业。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
Syn: cumulative lead time.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A network planning technique for the analysis of a projects completion time used for planning and controlling the activities in a project. By showing each of these activities and their associated time s, the critical path, which identifies those elements that actually constrain the total time for the project, can be determined. See: critical chain method, network analysis, critical activity, critic al path.   关键路线法—分析项目完工时间的网络规划技术,用来规划和控制项目活动。通过显示每一项活动及其相关时间,就能够确定关键路线,它标识出实际约束项目总时间的那些要素。参见:critical chain method,network nanlysis....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
Backflush performed at a specific point in the manufacturing process, at a critical operation, or at an operation where key components are consumed.   关键点倒冲法—在生产过程中的特定点、关键操作或消耗关键部件的操作中使用的倒冲法。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A variable or a set of variables that dominates the other variables. Focusing on these variables will y ield the greatest return in investment in quality control and improvement.   关键过程参数—支配其他变量的一个变量或 一组变量。关注这些变量能够在质量控制和改进方面获得最大投资收益。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
Processes that have large potential for loss-either money, property, or human life.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A dispatching rule that calculates a priority index number by dividing the time to due date remaining by the expected elapsed time to finish the job. For example,critical ratio=time remaining/work rem aining=30/40 =0.75.A ratio less than 1.0 indicates the job is behind schedule, a ratio greater than 1.0 indicates the job is ahead of schedule, and a ratio of 1.0 indicates the job is on schedule....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
One of a few organizational objectives whose achievement should be sufficient for organizational success.   关键成功要素—必须努力实现该要素以保证组织成功的几个组织目标之一。
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A modified ABC analysis where a subjective metric of the criticality of an item is assigned to each item.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The important and measurable traits of a product or process whose performance targets must be met to satisfy the customer. They adjust improvement efforts to meet consumer requirements. CTQs represent customer expectations for a product.   关键质量特性—关键质量特性是以满足消费者需求为绩效目标的一项产品或过程的重要的和可测量的特性。组织调整改善努力以满足消费者需求。CTQS代表了顾客对产品的期望。...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CRM
Abbreviation for customer relationship management and customer relations management.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 cross plot
Syn: scatter chart.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 cross-docking
The concept of packing products on incoming shipments so they can be easily sorted at intermediate warehouses or for outgoing shipments based on final destination. The items are carried from the incom ing vehicle docking point to the outgoing vehicle docking point without being stored in inventory at the warehouse. Cross-docking reduces inventory investment and storage space requirements. Syn: dire ct loading....
All Rights Reserved Powered BY WeCenter V4.1.0 © 2026 京ICP备16065701号