"e" 搜索结果,为您找到约 12205 条结果
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CSR
Abbreviation for customer service representative.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CTP
Abbreviation for capable-to-promise.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 C-TPAT
Abbreviation for Customs-Trade Partnership Against Terrorism.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 CTQs
Abbreviation for critical-to-quality characteristics.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 cubage
Cubic volume of space being used or available for shipping or storage.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 cube rate
1) A rate used to improve warehouse order picker productivity by placing items with smaller total cubic space requirements closer to the shipping area. A larger total number of items can be stored nea r the shipping area in this way, thereby reducing the aggregate order-picking travel time. 2) A freight rate calculated on cargo volume rather than weight....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
In warehousing and transportation, a measurement of the utilization of the total storage capacity of a vehicle storage bay, container, type of warehouse equipment, or entire warehouse. The intent is t o minimize unused horizontal or vertical space....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
问答 cubic space
In warehousing, a measurement of space available or required in transportation and warehousing.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The sociocultural factors of the organization's external environment. It includes values, work ethics, education, religion, and consumer and ecological factors.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A calculation based on the available-to-promise (ATP) figure in the master schedule. Two methods of computing the cumulative available-to-promise are used, with and without look-ahead calculation. The cumulative with look-ahead ATP equals the ATP from the previous period plus the MPS of the period minus the backlog of the period minus the sum of the differences between the backlogs and MPSs of all future periods until, but not to include, the period where point production exceeds the backlogs. The cumulative without look-ahead procedure equals the ATP from the previous period plus the MPS, min...
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The accumulated total of all forecast errors, both positive and negative. This sum will approach zero if the forecast is unbiased. Syn: sum of deviations.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The longest planned length of time to accomplish the activity in question. It is found by reviewing the lead time for each bill of material path below the item; whichever path adds up to the greatest number defines cumulative lead time. Syn: aggregate lead time, combined lead time, composite lead time, critical path lead time, stacked lead time. See: planning horizon, planning time fence....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The cumulative planned lead time when all purchased items are assumed to be in stock. Syn: composite manufacturing lead time.
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
The planning of parts and subassemblies by exploding a master schedule, as in MRP, except that the master-scheduled items and therefore the exploded requirements are time-phased in cumulative form. Us ually these cumulative figures cover a planning year....
行走的孤狼行走的孤狼 发起了提问 2016-08-11 00:00
A cumulative number, or running total, as a count of parts received in a series or sequence of shipments. The cumulative receipts provide a number that can be compared with the cumulative figures from a plan developed by cumulative MRP....
All Rights Reserved Powered BY WeCenter V4.1.0 © 2026 京ICP备16065701号